Engineering and construction
Check submittals against specs
Every submittal has to meet the spec section it answers. Today, someone senior reads it line by line.
Submittal: Pump P-2checked againstSpec 23 21 23
- Matches: Flow and head meet the duty point
- Matches: Materials match the spec
- Flagged: 5 hp motor, but the spec calls for 7.5 hp
- Question: Seal type not listed: a question for the supplier is drafted
The engineer reviews the flags and stamps the response
It flags; it never approves a submittal. Every check points to the spec line it came from.